NOAA Finalizes Secondary Payload for JPSS-2

news image
Special Stories
27 Feb 2020 1:00 AM
[From NOAA]  When the second satellite in the Joint Polar Satellite System series launches to space in 2022, it will do so with a secondary NASA payload, an inflatable decelerator technology designed to one day land humans on Mars. JPSS-2 is a continuation of the JPSS series of satellites. Working in tandem with NOAA-20, it will capture precise observations of the world’s atmosphere, land and waters, and provide data that inform seven-day forecasts and extreme weather events. Flying as a piggyback mission will be NASA’s Low-Earth Orbit Flight Test of an Inflatable Decelerator, or LOFTID. The decelerator is built to one day carry heavy payloads through the thin atmosphere of Mars and to recover booster rockets after launch. But NASA must first test the technology’s ability to survive the incredible heat and speeds of re-entry to Earth. LOFTID is funded by NASA’s Space Technology Mission Directorate and managed by NASA’s Langley Research Center in Hampton, Virginia. [Engineers prepare for the flexible heat shield installation on the inflatable structure. The view is from bottom side, heat shield is on top. The gold straps hanging from the black triangles will be attached to the inflatable structure strapping and tensioned for LOFTID. (Credit: NASA's Langley Research Center)] Beyond LOFTID, NOAA will not pursue additional rideshare components with JPSS-2, due to the mission’s complexity and cost, according to a top NOAA satellite official. “Our team looked at the cost to the government of doing the additional rideshare, the readiness and timing of the payloads available from the private sector, our NASA partners, the growing potential of the private rideshare industry to fly these types of small satellite missions, and the overall mission complexity associated with adding additional secondary payloads,” said Karen St. Germain, Deputy Assistant Administrator for Systems at NOAA's Satellite and Information Service. “Based on all of these factors, we decided that pursuing additional rideshare payloads was not a good fit for the JPSS-2 mission.  We continue to learn from each of these rideshare studies.” https://www.youtube.com/watch?v=CkJkujA0ivY JPSS-2 is scheduled to launch from Vandenberg Air Force Base, Calif. It will be renamed NOAA-21 when it reaches orbit. St. Germain said NOAA will continue exploring ways to partner with the private sector, including providing access to space through the JPSS-3 launch, currently scheduled for the second quarter of fiscal year 2025.
All Weather News
More
FORECAST: Artemis II Set To Launch Today

FORECAST: Artemis II Set To Launch Today

Artemis 2 is finally ready to launch! After t

1 Apr 2026 6:45 PM
April Brings Cooler Temperatures

April Brings Cooler Temperatures

ABOVE - The month of March has been setting r

1 Apr 2026 5:10 PM
Severe Threat Ramps Up in the Plains

Severe Threat Ramps Up in the Plains

A severe weather threat is taking shape acros

1 Apr 2026 5:10 PM
Several Severe Storm Chances For the Midwest, East Coast

Several Severe Storm Chances For the Midwest, East Coast

Several waves of low pressure will traverse t

1 Apr 2026 11:00 AM
SW Pattern Change Ahead: Tracking Rain & Snow

SW Pattern Change Ahead: Tracking Rain & Snow

While much of the country, and in particular

1 Apr 2026 9:00 AM
Critical Fire Danger & Isolated Dry Thunderstorms

Critical Fire Danger & Isolated Dry Thunderstorms

It's been unbearably hot across the West for

31 Mar 2026 1:50 AM
PEAK BLOOM - Cherry Blossoms Emerge at the National Mall

PEAK BLOOM - Cherry Blossoms Emerge at the National Mall

Top Image Credit: National Parks ServiceSprin

29 Mar 2026 7:00 PM